google.com, pub-9591068673925608, DIRECT, f08c47fec0942fa0 Drill Prime Well Poleng - MEDIA MONITORING OIL AND GAS -->

MARKET

Friday, September 22, 2017

Drill Prime Well Poleng



PT Pertamina EP today (21/9) began to drill prime Poleng wells located in the eastern Java Sea. Drilling is estimated to be 45 days long with a target of 9,000 feet depth.

Director of Operations and Production of PT Pertamina EP Chalid Said Salim said the USD 15 million project is expected to contribute positively to oil and gas production in East Java. The drilling is estimated to produce 700 barrels of oil per day and 1.2 million cubic feet of gas per day.

"Drilling is also aimed at adding hydrocarbon absorption points in the CW area in the Kujung structure," he said yesterday (20/9).

Location The well to be drilled is named Poleng N2 or CW-12H well. The drilling is a synergy of two Pertamina subsidiaries namely Pertamina EP and Pertamina Hulu Energi. Field Manager of Poleng Charles S. Siallagan added, Asset 4 Poleng Field team has reviewed the personal readiness and drilling equipment.

IN INDONESIA


Bor Perdana Sumur Poleng


PT Pertamina EP hari ini (21/9) mulai melakukan pengeboran perdana Sumur Poleng yang berada di Laut Jawa bagian timur. Pengeboran diperkirakan berdurasi 45 hari dengan target kedalaman 9.000 kaki. 

Direktur Operasi dan Produksi PT Pertamina EP Chalid Said Salim menuturkan, proyek senilai USD 15 juta itu diharapkan mampu memberikan kontribusi positif terhadap produksi minyak dan gas di Jatim. Pengeboran tersebut diestimasi mampu menghasilkan 700 barel minyak per hari dan 1,2 juta kaki kubik gas per hari. 

"Pengeboran ilu juga bertujuan menambah titik serap ‘hidrokarbon di area CW di struktur Kujung,” katanya kemarin (20/9).

Lokasi Sumur yang akan dibor bernama Poleng N2 atau sumur CW-12H. Pengeboran tersebut merupakan sinergi dua anak usaha Pertamina yakni Pertamina EP dan Pertamina Hulu Energi. Field Manager Poleng Charles S. Siallagan menambahkan, tim Asset 4 Poleng Field telah memeriksa ulang kesiapan personal dan peralatan pengeboran.

Jawa Pos, Page-6, Thursday, Sept 21, 2017

No comments:

Post a Comment

POP UNDER

Iklan Tengah Artikel 1

NATIVE ASYNC

Iklan Bawah Artikel